Search results 0

Members should follow procedures as per their Shipboard Management Systems (SMS) and latest industry practices. The below guidelines are for Members’ awareness and not a replacement for their SMS. Usually, SMS contains history of bunker quality issues in fleet vessels and can be a good reference point for awareness.

1. Pre‑Fixing and Planning Stage

  • Assess port-specific and supplier-specific risks. 
  • Avoid decisions based solely on lowest price. 
  • Specify latest ISO 8217 standard in charter parties. Members’ technical management team should review the latest ISO 8217 standard with regard to the specific ship before adhering to it.  
  • Review fuel suitability (stability, compatibility, cold flow).
  • Obtain Certificate of Quality. Bunker fuel fingerprint (GC-MS) tracing is very handy in bunker claims.
  • Consider bunker quantity and quality surveys.
  • Insist that bunker samples (primary) will be ship samples and not barge samples. Refer MSC-MEPC.2/Circ.18 11 July 2024.
  • Consider standard, independent, high-quality and high-integrity labs for bunker fuel testing.
  • Avoid mixing stems unless compatibility confirmed.
  • Maintain strict fuel segregation.

Exercise caution with:

  • Biofuel blends.

2. Pre‑Bunkering Preparation

  • Confirm tank readiness and segregation plan.
  • Avoid commingling with existing bunkers.
  • Conduct compatibility testing if required.
  • Inspect and clean sampling equipment.
  • Install drip sampler and record the seal number in Tank Gauging Form (TGF).

3. During Bunkering (Critical Stage)

Start continuous drip sampling at commencement.

Ensure sampling is:

  • Continuous.
  • Representative.
  • Seal the needle valve and record seal numbers.
  • Insist that bunker samples (primary) will be ship samples and not barge samples. Refer MSC-MEPC.2/Circ.18 11 July 2024.

Monitor for:

  • Water ingress.
  • Unusual appearance/density.
  • Irregular flow.
  • Unwarranted air blows during bunkering leading to a sudden increase in fluid flow (increased flow is known to impact Mass Flow Meter readings (MFM)).
  • Unwarranted air blows towards end of bunkering operation (may lead to cappuccino effect).
  • Use of heavy magnets on bunker barge supply line or in vicinity of MFM. It is known that heavy magnets impact MFM by affecting the fluid flow rates.

4. Sampling & Documentation

  • Check seal integrity after completion.
  • Mix sample thoroughly before bottling.
  • Fill bottles in multiple passes.
  • Apply unique numbered seals.

Record seal numbers on:

  • Sample labels.
  • BDN.
  • TGF. 
  • Ensure samples are signed jointly with the supplier.

Do not:

  • Sign/stamp labels before completion. 
  • Sign/stamp extra labels.

Remember to keep ship and staff stamps under strict control to avoid misuse.

5. Post‑Bunkering (Before Use)

  • Send samples to standard, independent but high-quality and high-integrity labs for bunker fuel testing.
  • Do NOT consume fuel until test results are received. Members technical team should highlight concerns to ship staff in cases where results are within range however closer to limits.
  • If borderline results require additional testing and analysis, same should be considered.

Verify:

  • BDN vs laboratory results.
  • ISO limits and operational parameters (TSP, cat fines).
  • Review results against any specific guidance in SMS of the company.

6. Fuel Management Onboard

  • Adjust purifier settings to fuel characteristics as highlighted in the bunker fuel oil analysis reports. 
  • Maintain appropriate temperature (esp. paraffinic fuels) as highlighted in the bunker fuel oil analysis reports. 

Monitor:

  • Sludge formation.
  • Filter condition.
  • Separator performance.